

STAND ALONE PLANTS POWER PILOT
The Power Pilot can be installed upstream of all loads or upstream the only loads that generate the problems outlined below. One typical installation diagram of the Power Pilot inserted between hydroelectric power production unit and users is shown below.
THE OPERATING PRINCIPLE OF THE POWER PILOT
CAN BE SUMMARIZED IN THE FOLLOWING POINTS:
- Constantly monitors the input network and, if it detects a transient overload of the hydroelectric generator (voltage and frequency values outside certain thresholds), supplies the load by totally or partially taking energy from the batteries in order to satisfy the output power required. It is able to mix the input mains power with the available power from batteries.
- Keeps in charge, under the control of the multiprocessor board, an energy reserve consisting of a group of appropriately sized batteries.
- It performs a double conversion (AC / DC DC / AC) of the input network and generates a sinusoidal alternating voltage of extremely stable amplitude and frequency at the output regardless of the changes and / or variations present in the input network.

POWER PILOT
SERIE PPM

Features may be subject to change without notice.
POWER PILOT
SERIE PPT

Features may be subject to change without notice.

Features may be subject to change without notice.
A RANGE OF PRODUCTS SUITABLE IN EVERY CONDITION
INSTALAÇÕES EM ILHA
Turbinas Pelton e Banki
INSTALAÇÕES EM PARALELO REDE
Turbinas Pelton e Banki
CANALIZAÇÕES DE ÁGUA
Certificados IREM
PICO HYDRO
TPD