Select Page
Turbina Pelton bi-getto a regolazione ibrida

Just tested a special IREM Ecowatt Hydro Pelton turbine ensuring a mixed regulation of the flow: on/off and by needle valve.
This solution optimizes the performance of plants working on very high heads by maintaining all the advantages of IREM traditional system.

Related news:

Hydro Electric Turbines IREM certified for aqueducts

The Pelton and Banki turbines IREM ECOWATT HYDRO special for hydroelectric plant installed on aqueduct, reply to the legislation about the manufacturing process and materials usable in contact with water for human consumption governed in Europe by the European Directive 98/83/CE

read more

IREM

IREM SpA a socio unico

Headquarters:

Via Abegg 75
10050 Borgone Susa (TO) – ITALY

Registered office:

Via Rocciamelone 58
10050 S.Antonino di Susa (TO) – ITALY

Tel. +39 011 9648211 – Fax +39 011 9648222
E-mail: irem@irem.it

Business Register:

Torino / VAT No. IT00389630013
Fully paid-up capital: Euro 1.080.000
P.iva / CF: IT00389630013

DOWNLOAD HYDRO
POWER
NEWSLETTER CONTACT