POWER QUALITY
Energy Saving

HYDRO POWER
POWER LIGHTING


When the objective is to exploit medium-low heads with a reliable, compact and easy-to-manage solution, ECOWATT HYDRO Banki turbines represent a proven design choice. Designed and manufactured by IREM, they are developed to minimise installation and commissioning activities while simplifying plant construction.

Suitable for heads ranging from 5 to 50 metres and flow rates from 20 to 1,500 litres per second, Banki cross-flow turbines can be used both in traditional hydroelectric plants and in water supply networks, where they allow hydraulic energy that would normally be dissipated to be recovered and converted into renewable electrical energy.

Why choose a Banki turbine?

The robust construction and simplicity of the operating principle enable ECOWATT HYDRO turbines to ensure high reliability even under demanding environmental conditions, while maintaining compact dimensions thanks to their compact design.

The excellent efficiency curve also ensures high performance even at reduced flow rates, while simple and efficient flow regulation reduces maintenance requirements and allows operation even in the presence of solid materials carried by the water.

What are the advantages of Banki turbines for hydroelectric plants?

The architecture of Banki turbines helps simplify civil and hydraulic works, reducing the overall complexity of the plant. The automation system with electric actuators increases safety, reliability and ease of operation, while the self-cleaning process of the runner promotes operational continuity even under the most demanding operating conditions.

Each turbine-generator unit is designed according to specific application requirements and supplied in compliance with the Machinery Directive with CE marking, providing a complete solution that combines customisation, manufacturing quality and reliability, distinctive features of IREM HYDRO POWER solutions.

Related news:

IREM BANKI TURBINE FOR PARALLEL TO THE ELECTRICAL GRID

The Banki IREM ECOWATT HYDRO cross-flow turbines, for installations in parallel to the national grid, are designed and manufactured entirely by IREM to offer a compact, simple and functional system with the aim of reducing installation and commissioning operations to a minimum.

read more