Select Page

We are proud to announce that on 1st June 2016 Itoshiro Banba Seiryu Hatsudensho Power Plant, located in Gifu Prefecture, has been powered up by IREM 6-jets Pelton turbine of 125 kW.
During the opening ceremony were present local authorities and television.
We thank all the involved persons that have made this project possible.

Related news:

THE IREM PELTON TURBINES

The IREM Ecowatt Hydro Pelton turbines are designed and manufactured entirely by IREM to ensure reliable operation, with the aim of minimizing installation, commissioning and maintenance activities.

read more

BANKI ECOWATT HYDRO TURBINES

Banki ECOWATT HYDRO turbines are designed and produced entirely by IREM to create a compact, simple and functional system capable of minimizing installation and start-up activities.

read more

PICO HYDRO IREM: GREAT PERFORMANCE IN SMALL SIZE

When you are in presence of electrical users, of extremely low power and you do not have a connection to the national electricity grid, IREM is able to supply hydroelectric turbines of very limited size and potential without sacrificing reliability and high quality.

read more

IREM

IREM SpA a socio unico

Headquarters:

Via Abegg 75
10050 Borgone Susa (TO) – ITALY

Registered office:

Via Rocciamelone 58
10050 S.Antonino di Susa (TO) – ITALY

Tel. +39 011 9648211 – Fax +39 011 9648222
E-mail: irem@irem.it

Business Register:

Torino / VAT No. IT00389630013
Fully paid-up capital: Euro 1.080.000
P.iva / CF: IT00389630013

DOWNLOAD HYDRO
POWER
NEWSLETTER CONTACT