Select Page

We are proud to announce that on 1st June 2016 Itoshiro Banba Seiryu Hatsudensho Power Plant, located in Gifu Prefecture, has been powered up by IREM 6-jets Pelton turbine of 125 kW.
During the opening ceremony were present local authorities and television.
We thank all the involved persons that have made this project possible.

Related news:

IREM for the “Refuge Zero Fumée” project

With the project called “Refuges Zéro Fumée,” the first IREM hydroelectric turbine producing energy from a renewable source was installed at the Refuge de Chamoissière, run by Sebastien and Sylvie. This solution allows the refuge to be almost completely decarbonized, significantly reducing the environmental impact of its management.

read more

Why choose IREM Pelton and Banki hydroelectric turbines?

VIDEO | Water has always been a precious and inexhaustible renewable source. IREM hydroelectric turbines, the result of over seventy years of experience, make it possible to convert water energy into electricity in a sustainable way and with full respect for the environment.

read more
DOWNLOAD HYDRO
POWER
NEWSLETTER CONTACT