POWER QUALITY
Energy Saving

HYDRO POWER
POWER LIGHTING


IREM Three Ecowatt Hydro Pelton turbines in Trentino Alto Adige

Trentino Alto Adige confirms to be a region strongly linked to IREM products and particularly active in the development of the hydroelectric sector.

The photo shows three IREM Ecowatt Hydro Pelton turbines ready for shipment; two of these will be installed on the aqueducts of the municipalities of Sfruz and Bedollo, while the third one will be used in a traditional hydroelectric plant in the municipality of Anterselva.

Related news:

IREM BANKI TURBINE FOR PARALLEL TO THE ELECTRICAL GRID

The Banki IREM ECOWATT HYDRO cross-flow turbines, for installations in parallel to the national grid, are designed and manufactured entirely by IREM to offer a compact, simple and functional system with the aim of reducing installation and commissioning operations to a minimum.

read more

THE IREM PELTON TURBINES

Video: the IREM Ecowatt Hydro Pelton turbines are designed and manufactured entirely by IREM to ensure reliable operation, with the aim of minimizing installation, commissioning and maintenance activities.

read more