Select Page
IREM Three Ecowatt Hydro Pelton turbines in Trentino Alto Adige

Trentino Alto Adige confirms to be a region strongly linked to IREM products and particularly active in the development of the hydroelectric sector.

The photo shows three IREM Ecowatt Hydro Pelton turbines ready for shipment; two of these will be installed on the aqueducts of the municipalities of Sfruz and Bedollo, while the third one will be used in a traditional hydroelectric plant in the municipality of Anterselva.

Related news:

Hydro Electric Turbines IREM certified for aqueducts

The Pelton and Banki turbines IREM ECOWATT HYDRO special for hydroelectric plant installed on aqueduct, reply to the legislation about the manufacturing process and materials usable in contact with water for human consumption governed in Europe by the European Directive 98/83/CE

read more

IREM

IREM SpA a socio unico

Headquarters:

Via Abegg 75
10050 Borgone Susa (TO) – ITALY

Registered office:

Via Rocciamelone 58
10050 S.Antonino di Susa (TO) – ITALY

Tel. +39 011 9648211 – Fax +39 011 9648222
E-mail: irem@irem.it

Business Register:

Torino / VAT No. IT00389630013
Fully paid-up capital: Euro 1.080.000
P.iva / CF: IT00389630013

DOWNLOAD HYDRO
POWER
NEWSLETTER CONTACT