Select Page
IREM Three Ecowatt Hydro Pelton turbines in Trentino Alto Adige

Trentino Alto Adige confirms to be a region strongly linked to IREM products and particularly active in the development of the hydroelectric sector.

The photo shows three IREM Ecowatt Hydro Pelton turbines ready for shipment; two of these will be installed on the aqueducts of the municipalities of Sfruz and Bedollo, while the third one will be used in a traditional hydroelectric plant in the municipality of Anterselva.

Related news:

IREM Pelton turbine for Lizarraga micro mains

Lizarraga’s micro mains is an electrical distribution network in stand-alone configuration that generates, stores and consumes its own energy. The Lizarraga micro mains project was carried out in Sakana (Spain) to generate energy through renewable sources (photovoltaic and hydroelectric) by storing energy through the pumping of distributed water.

read more

IREM

IREM SpA a socio unico

Headquarters:

Via Abegg 75
10050 Borgone Susa (TO) – ITALY

Registered office:

Via Rocciamelone 58
10050 S.Antonino di Susa (TO) – ITALY

Tel. +39 011 9648211 – Fax +39 011 9648222
E-mail: irem@irem.it

Business Register:

Torino / VAT No. IT00389630013
Fully paid-up capital: Euro 1.080.000
P.iva / CF: IT00389630013

DOWNLOAD HYDRO
POWER
NEWSLETTER CONTACT