Select Page
The IREM Ecowatt Hydro Pelton turbines are designed and manufactured entirely by IREM to ensure reliable operation, with the aim of minimizing installation, commissioning and maintenance activities.
THE IREM PELTON TURBINES
The main feature of the IREM Ecowatt Hydro Pelton turbines is the hexagonal distributor, flanked today by hybrid twin jet and single jet solutions with plug, in order to cover all customer needs and the hydraulic characteristics of the system.

Each IREM Ecowatt Hydro Pelton turbine is specially designed for the specific characteristics required by the installation site. Consolidated technical solutions are also proposed for machines that are very different from each other in terms of power, dimensions, accessories and hydraulic characteristics.
The IREM Ecowatt Hydro solution is a winner precisely because all the models in the range have the same machine architecture in common, which can thus benefit from the experience gained from numerous installations in very different hydraulic conditions.
In synergy with product innovations, some solutions activated in the production processes have made it possible to obtain important certifications.

The advantages of the IREM Ecowatt Hydro range

5 YEARS WARRANTY
5 YEARS WARRANTY

All Turbine / Generator Groups are guaranteed for 5 years.

OIL FREE - HYDRO POWER IREM
OIL FREE

All automatisms are equipped with electric servomotors allowing the total absence of lubricating oils with particular attention to the environment.

DM 174/2004 ITALIA - ACS FRANCIA
DM 174/2004 ITALIA – ACS FRANCIA

For specific applications on the aqueduct, the hydroelectric turbines IREM Ecowatt Hydro comply with the European Directive 98/83 / EC “Water quality regulation intended for human consumption “regulated in Italy by the Ministerial Decree April 6, 2004 ° 174 and in France by DGS / SDA7A n ° 571 of 25 November 2002.
All the machines are accompanied by the IREM Declaration of Conformity to the DM 174/2004 and to the ACS (Attestation de Conformité Sanitaire).

IREM Product certifications HYDRO POWER
ECOWATT HYDRO

Product certifications

  • Machinery Directive 2006/42/CE
  • 98/83/CE European Drinking Water Directive
  • D.M. 174/2004 installation on aqueduct in Italy
  • ACS installation on aqueduct in France

Company certifications

  • UNI EN ISO 9001 (Quality)
  • UNI EN ISO 14001 (Environment)
  • UNI EN ISO 45001 (Safety)
FIT & FORGET - HYDRO POWER IREM
FIT & FORGET

The design choices are aimed at maximizing the robustness of the group system turbine-generator and electrical panel, materials and technical solutions create a product able to operate in the most severe working conditions.
Finally, the guarantee of a certified industrial product that is customized to suit your needs of the individual customer provides high standards of quality while minimizing maintenance operations.

simplicity of operation and management of the hydroelectric plant
USER FRIENDLY

The simplicity of operation and management of the hydroelectric plant have always been characteristic elements of the development and innovation philosophy of hydroelectric turbines IREM Ecowatt Hydro. The long experience gained during years of continuous improvement has allowed us to obtain a truly product simple to use.

QUICK DELIVERY - Pelton turbines IREM
QUICK DELIVERY

Thanks to standardization of the production processes, it’s possible to provide a very short delivery time.

Related news:

IREM’s PICO HYDRO TPD system: sustainable energy for isolated areas

IREM continues to innovate to offer cutting-edge solutions in the HYDRO POWER sector, always putting quality, efficiency and sustainability first. Among these, the TPD PICO HYDRO system, which thanks to the vertical axis Pelton turbine, designed to offer maximum efficiency and reliability, is able to generate energy in a simple and sustainable way.

read more
DOWNLOAD HYDRO
POWER
NEWSLETTER CONTACT