The Kwa-Madiba micro-hydroelectric plant located North-East of Mthatha, in the Eastern Cape province of South Africa, contributes to the economic development of local communities.

The Hydro Power plant was installed near the Thina Falls and provides electricity for about 50 families living in remote rural areas.
IREM contributed to the project by supplying a Banki Ecowatt Hydro turbinewith a flow rate of 165 l/s and a power of 51 kW.

Micro Hydro installations are ideal solutions for guaranteeing electricity to isolated communities.
Read the full article by Professor Marco Van Dijk, lecturer in the Department of Civil Engineering at the University of Pretoria.

Related news:

IREM Banki Hydroelectric Turbine, “Semi-OUT Door” installation

Taking advantage of the existing infrastructures, this project was carried out for the sturt-up of a micro-station TBA (Banki Turbine equipped with asynchronous generator) sized for a head of 5 meters and with 12 kW power for the production of energy. This turbin is also able to satisfy the needs of the mill which is currently used as a dwelling.

read more

Integrated plant for the production of electricity in the Democratic Republic of Congo

The communities of Kashara and Kimono in South Idjiwi and South Kivu in the Democratic Republic of the Congo not served by the national grid, will now be able to benefit from a clean, sustainable energy source suited to their current and future needs, giving life to new commercial, artisanal and health care activities thanks to the installation of an IREM hydroelectric turbine.

read more

IREM

IREM SpA a socio unico

Headquarters:

Via Abegg 75
10050 Borgone Susa (TO) – ITALY

Registered office:

Via Rocciamelone 58
10050 S.Antonino di Susa (TO) – ITALY

Tel. +39 011 9648211 – Fax +39 011 9648222
E-mail: irem@irem.it

Business Register:

Torino / VAT No. IT00389630013
Fully paid-up capital: Euro 1.080.000
P.iva / CF: IT00389630013

DOWNLOAD HYDRO
POWER
NEWSLETTER CONTACT