The commissioning of a TPA six jets IREM Pelton turbine-generator unit in the Fukuji plant, located in the prefecture of Gifu, in Japan, has been inaugurated.
The model of the IREM Pelton turbine installed in Fukuji has a nominal power of 250 kW, a nominal head of 88 m and a nominal flow rate of 274 l / s.
IREM Ecowatt Hydro Pelton turbines are reliable and long-lasting industrial products, manufactured in compliance with the Machinery Directive 2006/42 / EC.
The inauguration was a festive occasion attended by authorities and journalists. We thank all the people involved who made this project possible.
