Select Page

The commissioning of a TPA six jets IREM Pelton turbine-generator unit in the Fukuji plant, located in the prefecture of Gifu, in Japan, has been inaugurated.

IREM Pelton turbine-generator unit in the Fukuji plant has been inaugurated
Equipped with an asynchronous generator, the Pelton turbine unit allows easy and safe operation of the hydroelectric plant, ideal for “mini hydro” installations.
The model of the IREM Pelton turbine installed in Fukuji has a nominal power of 250 kW, a nominal head of 88 m and a nominal flow rate of 274 l / s.

IREM Ecowatt Hydro Pelton turbines are reliable and long-lasting industrial products, manufactured in compliance with the Machinery Directive 2006/42 / EC.

The inauguration was a festive occasion attended by authorities and journalists. We thank all the people involved who made this project possible.

Pelton turbine installed in Fukuji, Japan
Ecowatt Hydro Pelton turbines Japan

Related news:

Integrated plant for the production of electricity in the Democratic Republic of Congo

The communities of Kashara and Kimono in South Idjiwi and South Kivu in the Democratic Republic of the Congo not served by the national grid, will now be able to benefit from a clean, sustainable energy source suited to their current and future needs, giving life to new commercial, artisanal and health care activities thanks to the installation of an IREM hydroelectric turbine.

read more

IREM

IREM SpA a socio unico

Headquarters:

Via Abegg 75
10050 Borgone Susa (TO) – ITALY

Registered office:

Via Rocciamelone 58
10050 S.Antonino di Susa (TO) – ITALY

Tel. +39 011 9648211 – Fax +39 011 9648222
E-mail: irem@irem.it

Business Register:

Torino / VAT No. IT00389630013
Fully paid-up capital: Euro 1.080.000
P.iva / CF: IT00389630013

DOWNLOAD HYDRO
POWER
NEWSLETTER CONTACT