Select Page

Ready for dispatch a new IREM Ecowatt Hydro TBA 6/1,6 Banki turbine that will be installed in a hydroelectric plant in Piedmont and owned by Enel – the national power supply company.
Due to the peculiar site conditions, the customer chose an IREM Ecowatt Hydro cross flow turbine that is able to guarantee excellent levels of efficiency with different flow rates.

Related news:

Hydro Electric Turbines IREM certified for aqueducts

The Pelton and Banki turbines IREM ECOWATT HYDRO special for hydroelectric plant installed on aqueduct, reply to the legislation about the manufacturing process and materials usable in contact with water for human consumption governed in Europe by the European Directive 98/83/CE

read more

IREM

IREM SpA a socio unico

Headquarters:

Via Abegg 75
10050 Borgone Susa (TO) – ITALY

Registered office:

Via Rocciamelone 58
10050 S.Antonino di Susa (TO) – ITALY

Tel. +39 011 9648211 – Fax +39 011 9648222
E-mail: irem@irem.it

Business Register:

Torino / VAT No. IT00389630013
Fully paid-up capital: Euro 1.080.000
P.iva / CF: IT00389630013

DOWNLOAD HYDRO
POWER
NEWSLETTER CONTACT