Select Page

Two IREM Ecowatt Hydro Pelton hydroelectric turbines are ready for shipment: one TPD-024 and one TPA-164, which represent the two extremes of the range. Although with the due differences, these machines share the same design criteria.
Each IREM Ecowatt Hydro Pelton turbine is specially designed for the specific characteristics required by the installation site.
Consolidated technical solutions are also proposed for machines that are very different from each other in terms of power, dimensions, accessories and hydraulic characteristics.
The Ecowatt Hydro solution is a winner because all the models in the range share the same machine architecture that can benefit from the experience gained in installations in very different hydraulic conditions.
In synergy with product innovations, some innovative solutions activated in the production processes have made it possible to obtain new important certifications.

 

The advantages of the IREM Ecowatt Hydro range:

RELIABILITY
Long experience and several installations have made the production of machines very reliable.

STRENGTH
The design choices are aimed at maximizing the strength of the machine. The materials and technical solutions make a product able to operate in the worst working conditions.

CERTIFICATIONS
Products certifications:

  • Machinery Directive 2006/42/CE
  • European drinking water directive 98/83 EC
  • D.M. 174/2004 installations in aqueducts in Italy
  • ACS installations in aqueducts in France

Company certifications:

  • UNI EN ISO 9001 (Quality)
  • UNI EN ISO 14001 (Environment)
  • BS OHSAS 18001 (Health and safety)

EASY INSTALLATION
The machine is completely assembled in IREM in order to reduce the operations and time during the installation.

COMPACT DESIGN
The design solutions enable IREM to have the most compact machine available in the market, with evident advantages during operations of transport, installation and management.

EASY OPERATION
The long experience gained during years of continuous improvement, results in a product easy to use.

REDUCED MAINTENANCE
The certified industrial product guarantees high standard of quality reducing maintenance to a minimum.

QUICK DELIVERY
Thanks to standardization of the production processes, it’s possible to provide a very short delivery time.

Related news:

IREM Banki Hydroelectric Turbine, “Semi-OUT Door” installation

Taking advantage of the existing infrastructures, this project was carried out for the sturt-up of a micro-station TBA (Banki Turbine equipped with asynchronous generator) sized for a head of 5 meters and with 12 kW power for the production of energy. This turbin is also able to satisfy the needs of the mill which is currently used as a dwelling.

read more

Integrated plant for the production of electricity in the Democratic Republic of Congo

The communities of Kashara and Kimono in South Idjiwi and South Kivu in the Democratic Republic of the Congo not served by the national grid, will now be able to benefit from a clean, sustainable energy source suited to their current and future needs, giving life to new commercial, artisanal and health care activities thanks to the installation of an IREM hydroelectric turbine.

read more

IREM

IREM SpA a socio unico

Headquarters:

Via Abegg 75
10050 Borgone Susa (TO) – ITALY

Registered office:

Via Rocciamelone 58
10050 S.Antonino di Susa (TO) – ITALY

Tel. +39 011 9648211 – Fax +39 011 9648222
E-mail: irem@irem.it

Business Register:

Torino / VAT No. IT00389630013
Fully paid-up capital: Euro 1.080.000
P.iva / CF: IT00389630013

DOWNLOAD HYDRO
POWER
NEWSLETTER CONTACT