AQUEDUCT
INSTALLATIONS
HYDRO TURBINES
PELTON TURBINE
TPA AQUEDUCT
BANKI TURBINE
TBA AQUEDUCT
AQUEDUCTS
IREM CERTIFIED
The Pelton and Banki turbines IREM, special for hydroelectric plant installed on aqueduct, reply to the legislation about the manufacturing process and materials usable in contact with water for human consumption governed in Europe by the European Directive 98/83/CE, in Italy DM 174/2004.
Compliance with D.M. 174/2004 is certified by a Third-Party Organization.
Today an interesting opportunity is represented by the aqueduct installations, where the drinking water is bringing into pressure pipe and the turbine can be placed into the existing plant with the aim of energy recovery, which otherwise will be dissipated, transforming it into electricity.
Considering the extreme importance concerning the public health, for the specific aqueduct installations, IREM supplies hydroelectric turbines that, thanks to suitable materials, industrial process and specific controls comply with the regulations in force on materials that can be used in contact with water intended to human consumption.
In this specific sector, IREM claims more than 160 installation In Italy and abroad.
98/83/CE – EUROPEAN DIRECTIVE
D.M. 174/2004 – ITALY
ECOWATT HYDRO turbines are certified according to:
- Risk analysis
- Tracking of certified materials
- Migration test
- Certification of production standards
- Specific Manual
POWER RANGE
MORE THAN
180 INSTALLATION
ON AQUEDUCTS
A RANGE OF PRODUCTS SUITABLE IN EVERY CONDITION
GRID CONNECTED PLANTS
Pelton and Banki Turbines
STAND ALONE PLANTS
Pelton and Banki Turbines
AQUEDUCT INSTALLATIONS
IREM Certified
PELTON TURBINES
TPA - TPS
BANKI TURBINES
TBA - TBS
PICO HYDRO
TPD
CONTROL BOARD
For plants in parallel to the electrical grid
CONTROL BOARD
For plants in stand-alone
POWER INTEGRATOR
Power Pilot
POWER RANGE
Ecowatt Hydro Turbines














