Select Page
HYDRO POWER
PELTON AND BANKI HYDRO TURBINES
IREM. THE RIGHT CHOICE

IREM PROPOSAL

Grid connected Hydro Turbines - Pelton and Banki Hydro Turbines - IREM

GRID CONNECTED PLANTS

Pelton and Banki Turbines
Stand Alone  Hydro Turbines - Pelton and Banki Hydro Turbines - IREM

STAND ALONE PLANTS

Pelton and Banki Turbines
AQUEDUCT INSTALLATIONS

AQUEDUCT INSTALLATIONS

IREM Certified
Pelton TURBINES - IREM Ecowatt Hydro Turbines

PELTON TURBINES

TPA – TPS
IREM BANKI TURBINES - Ecowatt Hydro Turbines

BANKI TURBINES

TBA – TBS
Control board for plants in parallel to the electrical grid

CONTROL BOARD

For plants in parallel to the electrical grid
Control board for plants in stand-alone

CONTROL BOARD

For plants in stand-alone
Power Integrator - Ecowatt Hydro turbines

POWER INTEGRATOR

Power Pilot
Ecowatt Hydro Turbines - Power Range IREM

POWER RANGE

Hydro Turbines

ENERGY AND SAVING FROM WATER

HYDRO ELECTRIC TURBINES PELTON AND BANKI

Water is the ideal renewable power source, used by man since the beginning of time.
IREM turbines as result of seventy years’ experience, transform the energy of the water into electricity in a clean and respectful way for the environment.
The IREM turbines Pelton and Banki are the ideal solution for those places where the electrical energy is not available from the electrical grid or for producing energy to be transferred to the power grid.
Besides the use on streams, these water turbines may be integrated in aqueducts, existing or brand new, in order to recover the energy, which often has to be dissipated through special and expensive equipment and transform an expensive service into a source of profit.
Turbines provide a considerable contribution to ecology, since they help to avoid the burning of vast quantities of fossil fuel and hydrocarbons, which are held to be widely responsible for air pollution and the greenhouse effect.

ECOWATT HYDRO turbines

HIGHLIGHTS

5 WARRANTY IREM HYDRO POWER
WARRANTY

Extended warranty to 5 years.

OIL FREE - HYDRO POWER IREM
OIL FREE

All automatic devices are equipped with electrical actuators allowing the total absence of lubricating oils with a particular attention to the environmental.

turbines CEI 0-21
CEI 0-21

Thanks to the characteristics of its production system, standardization processes, and highly industrialized product, IREM is able to offer generation units compliant with the CEI 0-21 standard, consisting of TPA model turbines and QPR model panels with a capacity of up to 200 kW.

IREM DM 174/2004 ITALY - ACS FRANCE
DM 174/2004 ITALY

Referring to the specific applications on aqueduc, the hydroelectric turbines IREM Ecowatt Hydro are in compliance with the European Directive 98/83/CE “Regulation of the quality of water for human consumption” governed in Italy by DM 174/2004.
All turbines are cover of a Declaration of Conformity IREM to the DM 174/2004.

CERTIFICATIONS IREM HYDRO POWER
CERTIFICATIONS

Products certifications

  • Machinery Directive 2006/42/CE
  • 98/83 CE Direttiva europea acque potabili
  • D.M. 174/2004 installations in aqueducts in Italy

Company certifications

  • UNI EN ISO 9001 (Quality)
  • UNI EN ISO 14001 (Environment)
  • UNI ISO 45001 (Health and safety)
FIT & FORGET - HYDRO POWER IREM
FIT & FORGET

The design choices are aimed at maximizing the strength of the complete system turbine-generator group and control board. The materials and technical solutions make a product able to operate in the worst working conditions.
Finally the guarantee of a certified, personalized for the single customer and industrial product, high quality standards and minimizing maintenance operations.

USER FRIENDLY - IREM HYDRO POWER
USER FRIENDLY

The simplicity of operation and management of the hydroelectric plant are always been the characteristic elements of the philosophy of development and innovation of the hydroelectric turbines IREM Ecowatt Hydro. The long experience gained during years of continuous improvement, results in a product easy to use.

QUICK DELIVERY - IREM HYDRO POWER
QUICK DELIVERY

Thanks to standardization of the production processes, it’s possible to provide a very short delivery time.

PELTON AND BANKI TURBINES

SINCE 1947 MORE THAN 1850 TURBINES
IN OVER 50 COUNTRIES WORLDWIDE

DOWNLOAD HYDRO
POWER
NEWSLETTER CONTACT