Select Page
Hydro Electric Turbines IREM certified for aqueducts

In the aqueducts the drinking water is channeled in penstock in pressure to be conveyed towards the loading tanks that supply the primary distribution network. The hydroelectric turbines can be installed in the existing plant in order to recover the hydraulic energy, which otherwise should be dissipated, transforming it into electricity.

The Pelton and Banki turbines IREM ECOWATT HYDRO special for hydroelectric plant installed on aqueduct, reply to the legislation about the manufacturing process and materials usable in contact with water for human consumption governed in Europe by the European Directive 98/83/CE, in Italy DM 174/2004 and in France ACS (Attestation de Conformité Sanitaire). Both the conformity to D.M.174/2004 and the ACS –amongst the most restrictive standards in Europe – are certified by an external company.

The value-added of the certification:

  • Risk analysis
  • Tracking of certified materials
  • Migration test
  • Certification of production standards
  • Specific Manual

The most important features for the hydroelectric turbines installed on aqueducts for drinking water:

DM 174/2004 ITALIA – ACS FRANCIA - HYDRO POWER IREM

DM 174/2004 ITALY – ACS FRANCE
Referring to the specific applications on aqueduc, the hydroelectric turbines IREM Ecowatt Hydro are in compliance with the European Directive 98/83/CE “Regulation of the quality of water for human consumption” governed in Italy by DM 174/2004 and in France by DGS/SDA7A n° 571 dated 25/12/2002. All turbines are cover of a Declaration of Conformity IREM to the DM 174/2004 and ACS (Attestation de Conformité Sanitaire).

OIL FREE - HYDRO POWER IREM

OIL FREE
All automatic devices are equipped with electrical actuators allowing the total absence of lubricating oils with a particular attention to the environmental and the public-health.

FIT & FORGET - HYDRO POWER IREM

FIT & FORGET
The design choices are aimed at maximizing the strength of the complete system turbine-generator group and control board. The materials and technical solutions make a product able to operate in the worst working conditions. Finally the guarantee of a certified, personalized for the single customer and industrial
product, high quality standards and minimizing maintenance operations.

5 YEARS WARRANTY - HYDRO POWER IREM

WARRANTY
Extended warranty to 5 years.

The IREM experience in the field of hydroelectric turbines Pelton and Banki on aqueduct:
MORE THAN 160 INSTALLATION ON AQUEDUCTS IN ITALY AND ABROAD.

Related news:

IREM’s PICO HYDRO TPD system: sustainable energy for isolated areas

IREM continues to innovate to offer cutting-edge solutions in the HYDRO POWER sector, always putting quality, efficiency and sustainability first. Among these, the TPD PICO HYDRO system, which thanks to the vertical axis Pelton turbine, designed to offer maximum efficiency and reliability, is able to generate energy in a simple and sustainable way.

read more
DOWNLOAD HYDRO
POWER
NEWSLETTER CONTACT