An example of this collaboration is the “Michele Tessore” hydroelectric power plant in the municipality of Perrero (TO), a power plant built by Cav. Tessore in the 1930s.
The new solution was designed with the inclusion of a Banki IREM Ecowatt Hydro horizontal axis cross flow turbine-generator unit. The turbine is positioned outside the loading chamber, inside the power plant building. This fully automated solution is easy to insert and manage and is characterized by reduced maintenance.
The system has an electrical power of 50 kW generated with a head of 10 m and a flow rate of 900 l/s.
The Banki IREM ECOWATT HYDRO cross-flow turbines, for installations in parallel to the national grid, are designed and manufactured entirely by IREM to offer a compact, simple and functional system with the aim of reducing to minimum installation and commissioning operations.
ECOWATT HYDRO HIGHLIGHTS
WARRANTY
Extended warranty to 5 years.
OIL FREE
All automatic devices are equipped with electrical actuators allowing the total absence of lubricating oils with a particular attention to the environmental.
DM 174/2004 ITALY – ACS FRANCE
Referring to the specific applications on aqueduc, the hydroelectric turbines IREM Ecowatt Hydro are in compliance with the European Directive 98/83/CE “Regulation of the quality of water for human consumption” governed in Italy by DM 174/2004 and in France by DGS/SDA7A n° 571 dated 25/12/2002.
All turbines are cover of a Declaration of Conformity IREM to the DM 174/2004 and ACS (Attestation de Conformité Sanitaire).
CERTIFICATIONS
Products certifications
- Machinery Directive 2006/42/CE
- 98/83 CE Direttiva europea acque potabili
- D.M. 174/2004 installations in aqueducts in Italy
- ACS installations in aqueducts in France
Company certifications
- UNI EN ISO 9001 (Quality)
- UNI EN ISO 14001 (Environment)
- UNI ISO 45001 (Health and safety)
FIT & FORGET
The design choices are aimed at maximizing the strength of the complete system turbine-generator group and control board. The materials and technical solutions make a product able to operate in the worst working conditions.
Finally the guarantee of a certified, personalized for the single customer and industrial product, high quality standards and minimizing maintenance operations.
USER FRIENDLY
The simplicity of operation and management of the hydroelectric plant are always been the characteristic elements of the philosophy of development and innovation of the hydroelectric turbines IREM Ecowatt Hydro. The long experience gained during years of continuous improvement, results in a product easy to use.
QUICK DELIVERY
Thanks to standardization of the production processes, it’s possible to provide a very short delivery time.