The control boards QPR are an important component of the hydroelectric plant installed in parallel to the electrical grid.
To connect the turbine-generator group to the national grid is necessity to install a control board of automation and parallel to the grid, which optimize the plant management considering the relevant regulations.

Three functions are assigned to QPR control boards:

  • electrical connection of the hydroelectric plant to the national electric grid satisfying the regulatory requirements;
  • manage the electrical actuators for the regulation of the flow;
  • monitor all parameters of the plant.

The most complete solutions are equipped with several options, for example the remote control through computer, tablet or smartphone. Complete sensors devices such as temperature, vibration, loading tank water level and pressure sensors.
These solutions are perfect for mini-hydro plants with medium-high power, where it is essential to control the electrical and hydraulic data continuously.

Related news:

Hydro Electric Turbines IREM certified for aqueducts

The Pelton and Banki turbines IREM ECOWATT HYDRO special for hydroelectric plant installed on aqueduct, reply to the legislation about the manufacturing process and materials usable in contact with water for human consumption governed in Europe by the European Directive 98/83/CE

read more

IREM

IREM SpA a socio unico

Headquarters:

Via Abegg 75
10050 Borgone Susa (TO) – ITALY

Registered office:

Via Rocciamelone 58
10050 S.Antonino di Susa (TO) – ITALY

Tel. +39 011 9648211 – Fax +39 011 9648222
E-mail: irem@irem.it

Business Register:

Torino / VAT No. IT00389630013
Fully paid-up capital: Euro 1.080.000
P.iva / CF: IT00389630013

DOWNLOAD HYDRO
POWER
NEWSLETTER CONTACT