Select Page
IREM Banki turbines for plants installed on environmental flows

IREM Banki turbines for plants installed on environmental flows

The environmental flow describes the release water flow that a hydraulic derivation work must guarantee in the river or stream on which this work is built. When the hydraulic barriers create a significant vertical drop in the water flow, there are the conditions to...
IREM Pelton turbines for Pico Hydro

IREM Pelton turbines for Pico Hydro

This type of hydroelectric plants is used when the electrical power is really low and there isn’t a national grid. The produced energy is transformed in direct current and used near the hydroelectric turbine. HEAD: from 10 to 200 m FLOW: from 0.5 to 4 l/s ELECTRIC...
Hydro turbines IREM for Rural Electrification

Hydro turbines IREM for Rural Electrification

The availability of electric energy is fundamental to start the socioeconomic development of a territory. The presence of not electrified areas, where the people don’t have access to the electricity, represents, still today, a remarkable problem for a lot of...
Hydroelectric turbines certified DM174/2004 for drinking water

Hydroelectric turbines certified DM174/2004 for drinking water

Pelton turbines IREM Ecowatt Hydro specific for installations on aqueduct respond to the European normative on the process and on the usable materials in contact with the drinking water. This scope is controlled in Europe by the directive DE 98/83/CE, transpose in...

IREM

IREM SpA a socio unico

Headquarters:

Via Abegg 75
10050 Borgone Susa (TO) – ITALY

Registered office:

Via Rocciamelone 58
10050 S.Antonino di Susa (TO) – ITALY

Tel. +39 011 9648211 – Fax +39 011 9648222
E-mail: irem@irem.it

Business Register:

Torino / VAT No. IT00389630013
Fully paid-up capital: Euro 1.080.000
P.iva / CF: IT00389630013

NEWSLETTER CONTACT