The Banki IREM ECOWATT HYDRO cross-flow turbines for installations in parallel to the national grid, are designed and manufactured entirely by IREM to offer a compact, simple and functional system with the aim of reducing installation and commissioning operations to a...
Acque SpA is a company managing the entire Integrated Water Service (aqueduct, sewerage and purification) in the territory of Basso Valdarno and Valdinievole, which includes 55 municipalities across the provinces of Florence, Lucca and Pisa. Acque SpA has chosen IREM...
The IREM Ecowatt Hydro Pelton turbines are designed and manufactured entirely by IREM to ensure reliable operation, with the aim of minimizing installation, commissioning and maintenance activities. The main feature of the IREM Ecowatt Hydro Pelton turbines is the...
The new IREM HYDRO POWER 2026 catalogue is now available, presenting the complete range of solutions dedicated to renewable energy production from hydroelectric sources. The HYDRO POWER line includes IREM products designed for hydroelectric applications, from turbines...
The IREM solution for off-grid hydroelectric plants can also be developed with different levels of automation to better meet the specific requirements of the installation site. Starting from the simplest and most widespread systems, equipped with manually controlled...
In off-grid hydroelectric systems, without connection to the national power grid, energy management often represents a complex challenge. Demand peaks, overloads, energy waste, and poor power quality are frequent issues that can compromise the efficiency and stability...