ALAC has chosen IREM as a partner for the development of Micro Hydro projects, utilizing potable water from the existing aqueduct network prior to its distribution to users in the Langhe and Roero territories. A concrete example of this collaboration is the...
IREM has obtained CEI 0-21 certification for the generation units composed of hydroelectric turbine + grid parallel switchboard, passing all the required tests, carried out by an accredited laboratory. IREM is now able to offer Generation Units compliant with CEI 0-21...
The EDF Group, a global leader and the largest energy producer in France, has selected IREM as its partner for pico-hydro projects. A key example of this collaboration is the Banki-type cross-flow turbine-generator unit at the Tré la Tête water intake. This system...
What is the TPD PICO HYDRO system? IREM continues to innovate to offer cutting-edge solutions in the HYDRO POWER sector, always putting quality, efficiency and sustainability first. Among these, the TPD PICO HYDRO system, which thanks to the vertical axis Pelton...
From today it is possible to implement a “needle valve” type linear flow regulation system on existing Irem Pelton turbines. Irem Pelton turbines manufactured and installed with an on-off flow regulation system have achieved enormous success over the years, due to the...
IREM Pelton turbines are hydraulic turbines ideal for medium-high heads, from 20 to 550 meters, and flow rates from 0.5 to 450 liters per second. They guarantee reliable operation and allow installation, commissioning and maintenance activities to be reduced to a...