
The energy produced is consumed by the basic services of the residence and the surplus is transferred to the national distribution network.
At the output of the loading tank, previously used as a mill, the pipeline that feeds the turbine has been installed and the discharge is carried out in the existing channel. The entire installation was located in the mill itself and was integrated into its structures without modifying it in any way. In fact the turbine was positioned in a “semi-out door” structure: open on the sides and with a top cover made of a special transparent material designed to blend in with the landscape.
