Select Page
A success that is renewed after 27 years: this is the story that IREM has been writing with its distributor FOSSINGKRAFT in Norway for more than 30 years.

This collaboration has now passed the important milestone of the 150th turbine installed on Norwegian territory.

The attention and sensitivity to producing energy from renewable sources has always been fervent in Norway and the IREM-FOSSINGKRAFT team has been present and collaborated continuously over the years.

IREM-FOSSINGKRAFT turbine installed on Norwegian territory
In 1996, Inge Askeland decided to use the water flowing on her property to generate electricity. Helped by Ulf Andreassen from FOSSINGKRAFT, he quickly found the IREM turbo-alternator that suited him:

  • Machine : PELTON 75-200 225M
  • Generated Kw: 30kW

27 years pass and Inge Askeland makes a reminder: in 2023 it is he who buys his turbine number 2, or number 150 for Norway.

  • Machine: TPA 082-230 060°225SMB 4 4S0A0A
  • Generated kW: 40kW
150 IREM ECOWATT HYDRO TURBINES INSTALLED IN NORWAY

In both cases, IREM PELTON turbines were chosen which are characterized by:

5 YEARS WARRANTY
5 YEARS WARRANTY

All Turbine/Generator Groups are guaranteed for 5 years.

OIL FREE - HYDRO POWER IREM
OIL FREE

All automatisms are equipped with electric servomotors allowing the total absence of lubricating oils with particular attention to the environment.

Certificazioni IREM HYDRO POWER
DM 174/2004 ITALY – ACS FRANCE

Referring to the specific applications on aqueduc, the hydroelectric turbines IREM Ecowatt Hydro are in compliance with the European Directive 98/83/CE “Regulation of the quality of water for human consumption” governed in Italy by DM 174/2004 and in France by DGS/SDA7A n° 571 dated 25/12/2002. All turbines are cover of a Declaration of Conformity IREM to the DM 174/2004 and ACS (Attestation de Conformité Sanitaire).

Certificazioni IREM HYDRO POWER
CERTIFICATIONS

Product Certifications:

  • Machinery Directive 2006/42/CE
  • 98/83/CE European drinking water directive
  • Ministerial Decree 174/2004 installation on aqueduct in Italy
  • DHW installation on aqueduct in France

Company certifications

  • UNI EN ISO 9001 (Quality)
  • UNI EN ISO 14001 (Environment)
  • UNI ISO 45001 (Safety)
FIT & FORGET - HYDRO POWER IREM
FIT & FORGET

The design choices are aimed at maximizing the sturdiness of the turbine-generator group and electrical panel system, materials and technical solutions create a product capable of operating in the most severe working conditions.
Finally, the guarantee of a certified and customized industrial product on the needs of the individual customer provides high quality standards by reducing maintenance operations to a minimum.

impianto idroelettrico: semplicità di funzionamento IREM
USER FRIENDLY

The simplicity of operation and management of the hydroelectric plant have always been characteristic elements of the development and innovation philosophy of IREM Ecowatt Hydro hydroelectric turbines. The long experience gained during years of continuous improvement has made it possible to obtain a product that is truly simple to use.

QUICK DELIVERY IREM
QUICK DELIVERY

Thanks to the standardization of the production processes, it is possible to provide very fast delivery times.

Related news:

IREM’s PICO HYDRO TPD system: sustainable energy for isolated areas

IREM continues to innovate to offer cutting-edge solutions in the HYDRO POWER sector, always putting quality, efficiency and sustainability first. Among these, the TPD PICO HYDRO system, which thanks to the vertical axis Pelton turbine, designed to offer maximum efficiency and reliability, is able to generate energy in a simple and sustainable way.

read more
DOWNLOAD HYDRO
POWER
NEWSLETTER CONTACT