This collaboration has now passed the important milestone of the 150th turbine installed on Norwegian territory.
The attention and sensitivity to producing energy from renewable sources has always been fervent in Norway and the IREM-FOSSINGKRAFT team has been present and collaborated continuously over the years.
- Machine : PELTON 75-200 225M
- Generated Kw: 30kW
27 years pass and Inge Askeland makes a reminder: in 2023 it is he who buys his turbine number 2, or number 150 for Norway.
- Machine: TPA 082-230 060°225SMB 4 4S0A0A
- Generated kW: 40kW
In both cases, IREM PELTON turbines were chosen which are characterized by:
5 YEARS WARRANTY
All Turbine/Generator Groups are guaranteed for 5 years.
OIL FREE
All automatisms are equipped with electric servomotors allowing the total absence of lubricating oils with particular attention to the environment.
DM 174/2004 ITALY – ACS FRANCE
Referring to the specific applications on aqueduc, the hydroelectric turbines IREM Ecowatt Hydro are in compliance with the European Directive 98/83/CE “Regulation of the quality of water for human consumption” governed in Italy by DM 174/2004 and in France by DGS/SDA7A n° 571 dated 25/12/2002. All turbines are cover of a Declaration of Conformity IREM to the DM 174/2004 and ACS (Attestation de Conformité Sanitaire).
CERTIFICATIONS
Product Certifications:
- Machinery Directive 2006/42/CE
- 98/83/CE European drinking water directive
- Ministerial Decree 174/2004 installation on aqueduct in Italy
- DHW installation on aqueduct in France
Company certifications
- UNI EN ISO 9001 (Quality)
- UNI EN ISO 14001 (Environment)
- UNI ISO 45001 (Safety)
FIT & FORGET
The design choices are aimed at maximizing the sturdiness of the turbine-generator group and electrical panel system, materials and technical solutions create a product capable of operating in the most severe working conditions.
Finally, the guarantee of a certified and customized industrial product on the needs of the individual customer provides high quality standards by reducing maintenance operations to a minimum.
USER FRIENDLY
The simplicity of operation and management of the hydroelectric plant have always been characteristic elements of the development and innovation philosophy of IREM Ecowatt Hydro hydroelectric turbines. The long experience gained during years of continuous improvement has made it possible to obtain a product that is truly simple to use.
QUICK DELIVERY
Thanks to the standardization of the production processes, it is possible to provide very fast delivery times.